Public Realm Works

Colbert Link Bridge

Client:

Iarnrod Eireann

Consultants:

Iarnrod Eireann

Location:

Limerick City

Construction of new external pedestrian bridge to link the station entrance to the plaza along the side of the station. The Bridge was an insitu RC structure and the which was paved with natural Blue Limestone paving & coping units with stainless steel slot drains installed. New powder coated railings & infill panels were fabricated to match existing railings at the station and installed.