Client:
daa
Consultants:
Dublin Airport Infrastructure, daa
Location:
Level 5 Offices, Terminal 1, Dublin Airport
The project involved the complete strip out and total refurbishment of the Level 5 offices in Terminal 1 ,Dublin Airport, totalling circa 1500m2 of office space. The works included strip out of the office finishes, disposal of some existing furniture, removal of existing walls, reconfiguration of offices and the creation of new office space, relocation & reconfiguration of electrical floor boxes, grounds for screens, replacement of suspended ceilings and all surface finishes including carpet flooring and painting.